PRODUCTS & TECHNOLOGY

F-I nano conversion coating process

Product model:

Category:

Keywords:


Inquire Now

Details

What is the difference between FI nano conversion coating process and traditional pretreatment process?

Bath Order:

Stainless Steel Tank

Alkaline wash - the only step that requires heat

It is better to have DI-wash before F-1

F-1 Nano Conversion Coating Conversion Coating Treatment (≥20 seconds)

It is better to have DI-wash after F-1

Optional: Dry after F-1

Powder coating, paint, CED/AED

ee968e81-6e0e-47de-b8db-eeaf375308cb.jpg

Conversion Coating Process:

4c509163-0e4b-4990-b15b-4144b61cf347.jpg

Process - Reaction Mechanism

d3baf3e1-b502-4a7c-92a5-f0923f0359c2.jpg

Process - Thick Film - Forming and Control

6fed01af-284e-4781-8975-7792d2f89396.jpg

Slot and Control:

Matching Tank: deionized water + FI nano conversion coating

Adjust the PH-value between 3.8-4.5

Production:

Control PH-value (3.8-5.5)

Add FI nano conversion coating

Detection of Zr-concentration

Tank solution life: no limit (no limit on tank changing time)

Other points of attention: detection of washing water (conductivity)

6a98d3d1-b06b-4263-a6a4-d2051bf30acd.jpg

Process - Automatic Control with Shinechem Au-100 System

129ed893-e98c-4995-a86c-ad1fb712742d.jpg

Process Summary

1. 5-step-craft

2. Soak or spray treatment

3. Short contact time

4. Simple process control

5. Suitable for multi-metal processing

6. Unlimited slot changing time

7. Normal temperature treatment

Inquire Now

*Note: Please make sure to fill in the information accurately and maintain smooth communication. We will contact you as soon as possible.